Tendering in construction is often treated as an administrative hurdle.

“Get the bid out.”
“Submit on time.”
“Tick the compliance boxes.”

But by the time a major bid is submitted, most of the project’s fate is already set:

  • You have accepted a certain risk profile, scattered across clauses, specs and annexes

  • You have committed to methods and schedules that the project team will have to live with

  • You have priced based on specific assumptions about scope, interfaces and constraints

Those decisions are made long before site mobilisation. They are made in the tender phase.

That is why good tendering is not “paperwork”.

Good tendering is virtual project execution: running the project in documents first, then deciding whether you are willing to live with the result.

Tendering is where you lock in reality

Think about what is actually decided between RFP and submission:

  • What you are really committing to deliver, not just in headlines but in detailed obligations

  • Where responsibility sits when something goes wrong – ground risk, utilities, interfaces, LDs, performance

  • How much margin you have any chance of keeping, after realistic risk and effort

Once the contract is signed, changing these fundamentals is hard, slow and usually expensive.

Execution teams often “discover” in month three what was really agreed in the tender. At that point, the space to manoeuvre is limited.

If tendering is blind, execution becomes firefighting.

How tendering decisions show up in execution

The link from tender to delivery is direct, even if it is not always visible on day one.

  • Risk positions taken in tender show up later as claims, disputes, contingency burn and margin erosion

  • Methods described in the bid shape how planners and site teams approach work fronts and sequences

  • Interfaces written into the contract decide how conflicts between trades and parties are resolved

  • Assumptions buried in the bid become the starting point for arguments when reality does not match

Tender documents are often written in one language (bids, RFPs, contracts), while execution lives in another (work packs, schedules, site instructions). But they are two layers of the same reality.

If the tender phase is treated as “just paperwork”, you pay for it in:

  • Change orders you cannot fully justify

  • Responsibilities that are hard to defend

  • Work that is harder and riskier than you thought you priced

From forms to virtual project execution

Treating tendering as virtual project execution means a shift in mindset.

You are not just:

  • Filling templates

  • Assembling CVs

  • Dropping in standard text

You are:

  • Running the project on paper before you run it on site

  • Making explicit choices on who does what, under which conditions

  • Testing whether your plan and risk position actually hold together

Different teams do this at different levels of maturity. But the best ones have a few things in common:

  • They build an early overview of obligations and risks

  • They develop a coherent story of how they will deliver, not just a price

  • They make sure the final bid clearly answers what the client asked, and can be handed over to execution without translation from scratch

You can think of this as three loops:

  1. Overview and risk – understand all essentials on day one, not day ten

  2. Tender development – get clarity on what this requires and build the story, not just the price

  3. Bid delivery and quality – answer the ask, and prove why you are the right partner to deliver

These loops are not “nice to have” admin. They are your first pass at project execution.

Why documents are the operating layer

Underneath models, schedules and dashboards, construction projects still run on text.

  • RFPs and clarifications

  • Contracts and special conditions

  • Technical specifications and standards

  • Variation orders, claims and correspondence

That is where risk, responsibility, quality and cost are actually defined.

In tendering, these documents:

  • Define the baseline you will build and manage against

  • Set the rules of the game for changes, delays and performance

  • Frame what is “in” and what is “out” for both sides

If you do not understand and control this body of text in the tender phase, you do not really control the project you are bidding for.

Execution can add great tools, smart people and hard work. But it cannot fully undo a bad or blind tender.

Where AI and document intelligence fit in

The point of AI here is not to “write bids for you”.

The point is to help you:

  • See the full picture earlier

  • Make better decisions under time pressure

  • Keep a traceable link between what you agreed on paper and what you do on site

A useful AI teammate in tendering should:

  • Read the full tender set: RFPs, contracts, specs, annexes, addenda, Q&A

  • Help you map obligations, risks, interfaces and pass/fail criteria

  • Support your team in building methods, schedules and assumptions that stay connected to the documents

  • Check coverage and consistency in the final bid, so you know what you answered where

That is what makes virtual project execution more than a slogan. It turns the tender phase into a controlled decision process, not just a rush to deadline.

Where Volve comes in

At Volve, this is exactly the space we work in.

We use AI on the full text of tenders and project documents to help construction and infrastructure teams:

  • Get early clarity on obligations, risks and interfaces

  • Develop delivery strategies, methods and schedules anchored in real requirements

  • Deliver bids that answer the ask, line by line, with traceable links back to the RFP and clarifications

We also care about what happens next:

  • The same analysis can support execution, change control, claims and learning across projects

Because if tendering is virtual project execution, then:

  • Better tendering means better projects

  • Better control of documents in tender means better control of outcomes later

Projects will always be complex.

But tendering does not have to be “just paperwork”. It is the first, and often most important, round of project execution.

Read more about how AI can back the fundamentals of a bid process in construction here.

Herman B. Smith

CEO & Co-Founder

Share