Every price starts with how much there is.

Before anyone can price a building or a road, someone has to work out how much of it there is. On a traditional tender the client or consultant does it. On design and build, functional tenders and early involvement, the contractor does, from drawings, specifications and the model, at whatever maturity the design has reached.

01

Scope read in parts

Quantities taken off one drawing while a specification or addendum changes them somewhere else.

02

Take-off takes up time

Manual measurement and structuring absorb the days that should go to pricing and strategy.

03

Hard to check

No fast way to review an estimate against the full document set, or against how you priced a similar job before.

Everything the estimate needs, mapped to how you work.

Volve follows the estimating workflow, from the quantities in the drawings to the review before the number goes out. Each step structures the scope, does the reading and shows its source, so the judgement stays with your team.

Quantity take-off from the drawings and the model, ready to price.

Quantity take-off from the drawings and the model, ready to price.

Quantity take-off from the drawings and the model, ready to price.

Quantities extracted and structured by work package and discipline icon
Quantities extracted and structured by work package and discipline icon

Quantities extracted and structured by work package and discipline

Take-off checked against the drawings and the model icon
Take-off checked against the drawings and the model icon

Take-off checked against the drawings and the model

Each figure linked to its source drawing or specification icon
Each figure linked to its source drawing or specification icon

Each figure linked to its source drawing or specification

Quantities from the drawings and the model, ready to price.
One structured scope, so nothing is priced twice or missed.
One structured scope, so nothing is priced twice or missed.
One structured scope, so nothing is priced twice or missed.

One structured scope, so nothing is priced twice or missed.

One structured scope, so nothing is priced twice or missed.

One structured scope, so nothing is priced twice or missed.

Scope organised into work packages for your project type icon
Scope organised into work packages for your project type icon

Scope organised into work packages for your project type, such as earthworks, concrete and steel

Requirements and quantities held against each package icon
Requirements and quantities held against each package icon

Requirements and quantities held against each package

Clarifications raised before they turn into pricing risk icon
Clarifications raised before they turn into pricing risk icon

Clarifications raised before they turn into pricing risk

Review an estimate or valuation against the documents.

Review an estimate or valuation against the documents.

Review an estimate or valuation against the documents.

Surface scope that is not yet reflected in the price icon
Surface scope that is not yet reflected in the price icon

Surface scope that is not yet reflected in the price

Flag quantities that differ from the drawings or model icon
Flag quantities that differ from the drawings or model icon

Flag quantities that differ from the drawings or model

Check valuations against the contract baseline and changes icon
Check valuations against the contract baseline and changes icon

Check valuations against the contract baseline and changes

Review an estimate or valuation against the documents.

From tender documents to a 

traceable BoQ.

Measure and count what is there. Estimate and flag what isn’t. You decide how each gap closes.

You

Documents in

SpecificationDrawingsBIM

Client bill where there is one

You

Evidence-based take-off

Coded to the specification or your measurement standard (NS 3420, NRM2, CESMM 4), traced to source.

MeasuredCountedConditionalNot quantified
You decide

Open points

Listed with what closes each one. You choose:

Answer it yourself

Your own information or 
assumption.

Let Volve assume

Traceable to its basis and source.

Volve

Traceable BoQ

MeasuredCountedAssumption
You

Documents in

SpecificationDrawingsBIM

Client bill where there is one

You

Evidence-based take-off

Coded to the specification or your measurement standard (NS 3420, NRM2, CESMM 4), traced to source.

MeasuredCountedConditionalNot quantified
You decide

Open points

Listed with what closes each one. You choose:

Answer it yourself

Your own information or 
assumption.

Let Volve assume

Traceable to its basis and source.

Volve

Traceable BoQ

MeasuredCountedAssumption
You

Documents in

SpecificationDrawingsBIM

Client bill where there is one

You

Evidence-based take-off

Coded to the specification or your measurement standard (NS 3420, NRM2, CESMM 4), traced to source.

MeasuredCountedConditionalNot quantified
You decide

Open points

Listed with what closes each one. You choose:

Answer it yourself

Your own information or 
assumption.

Let Volve assume

Traceable to its basis and source.

Volve

Traceable BoQ

MeasuredCountedAssumption
You

Documents in

SpecificationDrawingsBIM

Client bill where there is one

You

Evidence-based take-off

Coded to the specification or your measurement standard (NS 3420, NRM2, CESMM 4), traced to source.

MeasuredCountedConditionalNot quantified
You decide

Open points

Listed with what closes each one. You choose:

Answer it yourself

Your own information or 
assumption.

Let Volve assume

Traceable to its basis and source.

Volve

Traceable BoQ

MeasuredCountedAssumption

Measured: taken off the drawings or model, traced to the sheet

Counted: items counted from schedules or drawings

Conditional: measurable once an open point is answered

Not quantified: needs your input or an assumption

What estimators ask Volve to do.

Tasks from a normal tender week. Every answer comes with its source.

1

Quantity check before pricing

In a lump sum bid, the client’s quantity errors become your cost. In a remeasured one, they decide your pricing strategy.

“Check the sheet piling in the bill against the drawings.”

What comes back

The discrepancies, bill item and sheet reference side by side.

2

Quantities where there’s no bill

Every number is measured or marked as an assumption. Nothing is guessed.

“Build the structure quantities from the drawings and the model, in our package structure, and mark what's assumed.”

What comes back

Quantities per package, each with its source or its assumption.

3

Qualified quantity estimates

What the documents don’t give you still has 
to be priced.

“Make qualified estimates for the missing groundworks quantities.”

What comes back

An estimate for each missing quantity, with the basis it rests on, split into what the documents verify and what is assumed.

4

Scope gaps priced at zero

The scope nobody priced usually sits between two packages.

“What's on the drawings that the bill doesn't cover?”

What comes back

Scope you'd otherwise price as absent, listed with the sheet.

5

Addendum impact

Three versions of the scope, and none of them matches Thursday's addendum.

“What changed in addendum 3, and which of our items does it hit?”

What comes back

Every item whose quantity or scope moved, old and new figure, with the clause.

6

Risk checklist

Every commercial term ends up in the price, the clarifications or the qualifications.

“Which terms in this tender need a price?”

What comes back

Yes or no per term: delay damages, securities, indexation, payment, traced to the clause.

1

Quantity check before pricing

In a lump sum bid, the client’s quantity errors become your cost. In a remeasured one, they decide your pricing strategy.

“Check the sheet piling in the bill against the drawings.”

What comes back

The discrepancies, bill item and sheet reference side by side.

2

Quantities where there’s no bill

Every number is measured or marked as an assumption. Nothing is guessed.

“Build the structure quantities from the drawings and the model, in our package structure, and mark what's assumed.”

What comes back

Quantities per package, each with its source or its assumption.

3

Qualified quantity estimates

What the documents don’t give you still has 
to be priced.

“Make qualified estimates for the missing groundworks quantities.”

What comes back

An estimate for each missing quantity, with the basis it rests on, split into what the documents verify and what is assumed.

4

Scope gaps priced at zero

The scope nobody priced usually sits between two packages.

“What's on the drawings that the bill doesn't cover?”

What comes back

Scope you'd otherwise price as absent, listed with the sheet.

5

Addendum impact

Three versions of the scope, and none of them matches Thursday's addendum.

“What changed in addendum 3, and which of our items does it hit?”

What comes back

Every item whose quantity or scope moved, old and new figure, with the clause.

6

Risk checklist

Every commercial term ends up in the price, the clarifications or the qualifications.

“Which terms in this tender need a price?”

What comes back

Yes or no per term: delay damages, securities, indexation, payment, traced to the clause.

1

Quantity check before pricing

In a lump sum bid, the client’s quantity errors become your cost. In a remeasured one, they decide your pricing strategy.

“Check the sheet piling in the bill against the drawings.”

What comes back

The discrepancies, bill item and sheet reference side by side.

2

Quantities where there’s no bill

Every number is measured or marked as an assumption. Nothing is guessed.

“Build the structure quantities from the drawings and the model, in our package structure, and mark what's assumed.”

What comes back

Quantities per package, each with its source or its assumption.

3

Qualified quantity estimates

What the documents don’t give you still has 
to be priced.

“Make qualified estimates for the missing groundworks quantities.”

What comes back

An estimate for each missing quantity, with the basis it rests on, split into what the documents verify and what is assumed.

4

Scope gaps priced at zero

The scope nobody priced usually sits between two packages.

“What's on the drawings that the bill doesn't cover?”

What comes back

Scope you'd otherwise price as absent, listed with the sheet.

5

Addendum impact

Three versions of the scope, and none of them matches Thursday's addendum.

“What changed in addendum 3, and which of our items does it hit?”

What comes back

Every item whose quantity or scope moved, old and new figure, with the clause.

6

Risk checklist

Every commercial term ends up in the price, the clarifications or the qualifications.

“Which terms in this tender need a price?”

What comes back

Yes or no per term: delay damages, securities, indexation, payment, traced to the clause.

1

Quantity check before pricing

In a lump sum bid, the client’s quantity errors become your cost. In a remeasured one, they decide your pricing strategy.

“Check the sheet piling in the bill against the drawings.”

What comes back

The discrepancies, bill item and sheet reference side by side.

2

Quantities where there’s no bill

Every number is measured or marked as an assumption. Nothing is guessed.

“Build the structure quantities from the drawings and the model, in our package structure, and mark what's assumed.”

What comes back

Quantities per package, each with its source or its assumption.

3

Qualified quantity estimates

What the documents don’t give you still has 
to be priced.

“Make qualified estimates for the missing groundworks quantities.”

What comes back

An estimate for each missing quantity, with the basis it rests on, split into what the documents verify and what is assumed.

4

Scope gaps priced at zero

The scope nobody priced usually sits between two packages.

“What's on the drawings that the bill doesn't cover?”

What comes back

Scope you'd otherwise price as absent, listed with the sheet.

5

Addendum impact

Three versions of the scope, and none of them matches Thursday's addendum.

“What changed in addendum 3, and which of our items does it hit?”

What comes back

Every item whose quantity or scope moved, old and new figure, with the clause.

6

Risk checklist

Every commercial term ends up in the price, the clarifications or the qualifications.

“Which terms in this tender need a price?”

What comes back

Yes or no per term: delay damages, securities, indexation, payment, traced to the clause.

1

Quantity check before pricing

In a lump sum bid, the client’s quantity errors become your cost. In a remeasured one, they decide your pricing strategy.

“Check the sheet piling in the bill against the drawings.”

What comes back

The discrepancies, bill item and sheet reference side by side.

2

Quantities where there’s no bill

Every number is measured or marked as an assumption. Nothing is guessed.

“Build the structure quantities from the drawings and the model, in our package structure, and mark what's assumed.”

What comes back

Quantities per package, each with its source or its assumption.

3

Qualified quantity estimates

What the documents don’t give you still has 
to be priced.

“Make qualified estimates for the missing groundworks quantities.”

What comes back

An estimate for each missing quantity, with the basis it rests on, split into what the documents verify and what is assumed.

4

Scope gaps priced at zero

The scope nobody priced usually sits between two packages.

“What's on the drawings that the bill doesn't cover?”

What comes back

Scope you'd otherwise price as absent, listed with the sheet.

5

Addendum impact

Three versions of the scope, and none of them matches Thursday's addendum.

“What changed in addendum 3, and which of our items does it hit?”

What comes back

Every item whose quantity or scope moved, old and new figure, with the clause.

6

Risk checklist

Every commercial term ends up in the price, the clarifications or the qualifications.

“Which terms in this tender need a price?”

What comes back

Yes or no per term: delay damages, securities, indexation, payment, traced to the clause.

1

Quantity check before pricing

In a lump sum bid, the client’s quantity errors become your cost. In a remeasured one, they decide your pricing strategy.

“Check the sheet piling in the bill against the drawings.”

What comes back

The discrepancies, bill item and sheet reference side by side.

2

Quantities where there’s no bill

Every number is measured or marked as an assumption. Nothing is guessed.

“Build the structure quantities from the drawings and the model, in our package structure, and mark what's assumed.”

What comes back

Quantities per package, each with its source or its assumption.

3

Qualified quantity estimates

What the documents don’t give you still has 
to be priced.

“Make qualified estimates for the missing groundworks quantities.”

What comes back

An estimate for each missing quantity, with the basis it rests on, split into what the documents verify and what is assumed.

4

Scope gaps priced at zero

The scope nobody priced usually sits between two packages.

“What's on the drawings that the bill doesn't cover?”

What comes back

Scope you'd otherwise price as absent, listed with the sheet.

5

Addendum impact

Three versions of the scope, and none of them matches Thursday's addendum.

“What changed in addendum 3, and which of our items does it hit?”

What comes back

Every item whose quantity or scope moved, old and new figure, with the clause.

6

Risk checklist

Every commercial term ends up in the price, the clarifications or the qualifications.

“Which terms in this tender need a price?”

What comes back

Yes or no per term: delay damages, securities, indexation, payment, traced to the clause.

What this changes for the estimate.

What this changes for the estimate.

What this changes for the estimate.

Numbers you can defend icon
Numbers you can defend icon

Numbers you can defend

Every quantity shows the drawing or clause it came from.

The same method every time icon
The same method every time icon

The same method every time

Your package structure, standard and checks on every tender.

Time back for judgement icon
Time back for judgement icon

Time back for judgement

The take-off is done. The team’s hours go to the missing quantities, rates, risk and price.

One use case, several roles.

Estimating, commercial and bid teams work from the same structured scope and the same numbers. Findings and sign-offs are shared and traceable, so the estimate the bid team builds is the one the project team inherits.

Estimators icon
Estimators icon

Estimators

Build the estimate on structured quantities, each one traced to its source drawing or clause.

Quantity surveyors & commercial icon
Quantity surveyors & commercial icon

Quantity surveyors & commercial

Review coverage and valuations against the documents, and see what an addendum has changed.

Bid & procurement icon
Bid & procurement icon

Bid & procurement

Price the bid and compare supplier offers against the same structured scope.

Sebastian Reinholdtsen icon
Sebastian Reinholdtsen icon

Within the same day, we have a first version of all major quantities taken off the client material.

Quantity surveyor

General contractor, buildings

See your tender structured and quantified.

Win the right work at the right terms

Bring one tender pack and we'll run it through Volve with you. You'll see the scope structured into work packages, the quantities pulled from the specifications, drawings and model, or what the estimate has not yet covered. Your team makes the call.

A working session on your own documents icon
A working session on your own documents icon

A working session on your own documents

Scope, quantities and what's not yet covered icon
Scope, quantities and what's not yet covered icon

Scope, quantities and what's not yet covered

No preparation needed from your team icon
No preparation needed from your team icon

No preparation needed from your team

Book a 30-Minute Demo

By submitting this form I agree to my details being used in sole connection with the intended enquiry. Please check our privacy policy to see how we protect and manage your submitted data.

The questions estimating teams ask first.

The questions estimating teams ask first.

The questions estimating teams ask first.

No. Volve structures the scope, extracts the quantities and traces them to source. Your team sets the rates, applies judgement and owns the number.