The bid team knew the risks. The site team inherits a contract.

What the bid team found, assumed and qualified rarely travels with the contract. Notice periods start running on day one, changes arrive with no record of what was priced in front of anyone, and the context that would prove a claim stays in the tender folder.

01

Time bars missed

Notice periods in fixed days, with loss of entitlement the site team never saw.

02

Changes with nothing to compare to

A variation is only a change if you can show what was there before.

03

Valuations checked by hand

Each payment application is checked against the contract under pressure, line by line.

What delivery needs from the tender.

Volve carries the tender into the contract, from the obligations you signed up to, to each change and valuation after it.

Obligations and time bars, from day one.

Obligations and time bars, from day one.

Obligations and time bars, from day one.

Duties, notice periods and deadlines extracted from the contract

Each one with its trigger and the clause that sets it

Continuous with what the bid team assessed

Volve dashboard showing portfolio learnings and tender evaluation activity
Volve dashboard showing portfolio learnings and tender evaluation activity
Volve dashboard showing portfolio learnings and tender evaluation activity
Volve dashboard showing portfolio learnings and tender evaluation activity

Each change checked against what was priced.

Each change checked against what was priced.

Each change checked against what was priced.

Instructions and revisions compared with the scope the price was built on

What changed, old and new, with the document

Change context kept for the claims you may need to prove

Valuations checked against the contract.

Valuations checked against the contract.

Valuations checked against the contract.

Payment applications checked against the contract and agreed changes

Quantities that differ from the drawings or model flagged

Each finding with the clause or sheet behind it

Volve dashboard showing portfolio learnings and tender evaluation activity

From the signed contract to a change you can prove.

Volve checks each change against what was priced. You decide what to do about it.

You

Changes in

InstructionsRevisionsValuations

Plus the contract and the tender it was priced from

Volve

Checked against what was priced

Each change set against the scope, positions and obligations the price was built on.

As pricedChangeNotice dueNeeds review
You decide

Open points

Listed with the clause and the deadline. You choose:

Notify

A notice with the clause, the date and the change attached.

Agree or record

Record it against the baseline, with the basis kept.

Volve

Traceable change log

AgreedClaim readyNotified
You

Changes in

InstructionsRevisionsValuations

Plus the contract and the tender it was priced from

Volve

Checked against what was priced

Each change set against the scope, positions and obligations the price was built on.

As pricedChangeNotice dueNeeds review
You decide

Open points

Listed with the clause and the deadline. You choose:

Notify

A notice with the clause, the date and the change attached.

Agree or record

Record it against the baseline, with the basis kept.

Volve

Traceable change log

AgreedClaim readyNotified
You

Changes in

InstructionsRevisionsValuations

Plus the contract and the tender it was priced from

Volve

Checked against what was priced

Each change set against the scope, positions and obligations the price was built on.

As pricedChangeNotice dueNeeds review
You decide

Open points

Listed with the clause and the deadline. You choose:

Notify

A notice with the clause, the date and the change attached.

Agree or record

Record it against the baseline, with the basis kept.

Volve

Traceable change log

AgreedClaim readyNotified
You

Changes in

InstructionsRevisionsValuations

Plus the contract and the tender it was priced from

Volve

Checked against what was priced

Each change set against the scope, positions and obligations the price was built on.

As pricedChangeNotice dueNeeds review
You decide

Open points

Listed with the clause and the deadline. You choose:

Notify

A notice with the clause, the date and the change attached.

Agree or record

Record it against the baseline, with the basis kept.

Volve

Traceable change log

AgreedClaim readyNotified

As priced: covered by what the price was built on

Change: differs from what was priced, traced to the document

Notice due: a time bar is running

Needs review: needs your reading before it can be placed

What project teams ask Volve once work starts.

Tasks from a normal tender week. Every answer comes with its source.

1

Every notice duty and deadline

Time bars in fixed days, with loss of entitlement if missed.

“List every notice duty with its deadline and consequence.”

What comes back

One table: the duty, the deadline in days, the consequence of missing it, and the clause behind each.

2

Is this a change?

A variation is only a change if the priced scope says so.

“Is the revised drainage layout in drawing C-210 Rev D a change to our scope?”

What comes back

What the tender said, what the revision says, and the clauses that decide it.

3

What the bid team assumed

The assumptions behind the price are the first thing a dispute asks for.

“What did we assume about ground conditions when we priced this?”

What comes back

The assumptions and qualifications from the tender, each with its source.

4

Check the valuation

A payment application is checked under pressure, line by line.

“Check valuation 6 against the contract and the agreed changes.”

What comes back

Each line that differs, with the clause, the change and the figure behind it.

5

Revisions since award

Drawings keep moving after the contract is signed.

“What changed between Rev B and Rev D of the structural drawings?”

What comes back

Every change, old and new, with the sheet and what it touches in the scope.

6

Context for a claim

A claim needs the before and after, and the clause in between.

“Build the timeline for the change to the foundation design.”

What comes back

Instructions, revisions and notices in order, each with its document.

What changes on site.

What changes on site.

What changes on site.

Claims you can prove

Each change shows what was priced and the clause behind it.

The same method every time

Your obligations register and checks on every project.

Time back for judgement

The reading and checking are done. The team’s hours go to the site, the client and the decisions that protect the margin.

From the bid team to the site team.

Project, commercial and contract teams work from the same scope and positions the bid team priced. Findings and notices are shared, so nothing the tender found is rediscovered on site.

Project managers

Run the project with the obligations and time bars in view.

Quantity surveyors & commercial

Check changes and valuations against the contract and what was priced.

Contract managers

Notify on time, and keep the context for the claims you may need to prove.

We’ve used Volve extensively on change requests, both in active projects and in older dispute cases. It structures the contractual context clearly and helps us see whether a claim actually holds up. That gives us a much stronger starting point in discussions.

Oddgeir Johnsen

Project manager, Kronstein Entreprenør

See your contract carried into delivery.

Win the right work at the right terms

Bring one contract and its tender, and we’ll run them through Volve with you. You’ll see the obligations and time bars, what the price was built on, and how a change is checked against it. Your team makes the call.

A working session on your own documents

Obligations, time bars and what was priced

No preparation needed from your team

Book a 30-Minute Demo

By submitting this form I agree to my details being used in sole connection with the intended enquiry. Please check our privacy policy to see how we protect and manage your submitted data.

What project teams want to know.

What project teams want to know.

What project teams want to know.

Building, infrastructure and energy, each with its own work packages and disciplines. Buildings: housing, offices and industrial buildings, hospitals, data centres, energy centres, treatment plants and land-based aquaculture. Infrastructure: road, rail and metro, stations and transport hubs, airports with terminals, utility networks for water, district heating and gas, and ports, locks and waterways. Energy: power grids and transformer stations, hydropower and dams, renewable generation from onshore wind, solar and storage, and onshore oil and gas, pipelines and facilities.
No. Volve reads the contract and the changes and traces each finding to its clause. Your team decides what to notify, agree or claim.