The standard form stops being standard the moment the client edits it.

Standard forms such as NS 8407, AB 18, NEC, JCT or FIDIC are balanced as written. The risk moves through what the client deletes, what the client adds, and what the client leaves unselected. The third is the one that gets missed, because an unselected option looks like nothing happened.

01

Design risk buried in one sentence

One clause near the novation, and the client's design becomes yours.

02

Time bars in fixed days

Seven or fourteen days, absolute, with loss of entitlement the site team never saw.

03

Ground risk moved indirectly

"For information only" on the geotech report does the same job as a full transfer.

04

Damages up, caps off

Carve-outs that decide what the overall cap is actually worth.

The contract review, clause by clause.

Volve reads the full tender and checks it against the standard form and your positions.

Assess the risk, anchored in the documents.

Assess the risk, anchored in the documents.

Assess the risk, anchored in the documents.

Risk drivers per package, across cost, schedule and quality

Critical items flagged, each with the clause or sheet behind it

The go/no-go and the risk price on the same basis

Risk assessment by package in Volve
Red flag contract review in Volve
Red flag contract review in Volve
Red flag contract review in Volve

Red flag review against your positions.

Red flag review against your positions.

Red flag review against your positions.

Red flags where the contract departs from your positions

Obligations, notice periods and time bars, with their triggers

Each finding with the clause behind it

The same checks on every tender.

The same checks on every tender.

The same checks on every tender.

Your risk checklist run across the full tender

Volve’s templates, your organisation’s or your own

Answers traced to source, comparable across projects

Risk checklist in Volve

From the standard form to a contract you chose.

Volve shows every deviation from the form and where it lands against your positions. You decide what to do about each one.

You

Contract in

Standard formClient editsAddenda

Plus your own standard positions

Volve

Every deviation classified and checked

Each deviation from the form, deleted, added or left unselected, set against your positions.

Red flagFor reviewAcceptableNo deviation
You decide

One call per red flag

Listed with the clause and the exposure. You choose:

Accept

Take the term as written.

Price or qualify

Carry it in the number or the reservations.

Push back or walk

Raise it in clarifications, or go no-bid.

Volve

Carries into the contract

Baseline at awardObligations and time barsChange context for claims
You

Contract in

Standard formClient editsAddenda

Plus your own standard positions

Volve

Every deviation classified and checked

Each deviation from the form, deleted, added or left unselected, set against your positions.

Red flagFor reviewAcceptableNo deviation
You decide

One call per red flag

Listed with the clause and the exposure. You choose:

Accept

Take the term as written.

Price or qualify

Carry it in the number or the reservations.

Push back or walk

Raise it in clarifications, or go no-bid.

Volve

Carries into the contract

Baseline at awardObligations and time barsChange context for claims
You

Contract in

Standard formClient editsAddenda

Plus your own standard positions

Volve

Every deviation classified and checked

Each deviation from the form, deleted, added or left unselected, set against your positions.

Red flagFor reviewAcceptableNo deviation
You decide

One call per red flag

Listed with the clause and the exposure. You choose:

Accept

Take the term as written.

Price or qualify

Carry it in the number or the reservations.

Push back or walk

Raise it in clarifications, or go no-bid.

Volve

Carries into the contract

Baseline at awardObligations and time barsChange context for claims
You

Contract in

Standard formClient editsAddenda

Plus your own standard positions

Volve

Every deviation classified and checked

Each deviation from the form, deleted, added or left unselected, set against your positions.

Red flagFor reviewAcceptableNo deviation
You decide

One call per red flag

Listed with the clause and the exposure. You choose:

Accept

Take the term as written.

Price or qualify

Carry it in the number or the reservations.

Push back or walk

Raise it in clarifications, or go no-bid.

Volve

Carries into the contract

Baseline at awardObligations and time barsChange context for claims

Deleted: a protection the form gave you, taken out

Added: a client clause the form never had

Left unselected: an option not chosen, which reads as nothing happened

Unchanged: as the standard form, no deviation

What commercial teams ask Volve before go/no-go.

Tasks from a normal tender week. Every answer comes with its source.

1

Risk per package

Risk sits in packages before it sits in a price.

“What are the main cost, schedule and quality risks in this tender, per package?”

What comes back

Risk drivers per package, critical ones flagged, each with the clause or sheet behind it.

2

Find the sentence that moves the design risk

Every standard keeps the client’s design at the client’s risk until one sentence moves it.

“Where in this contract does the client’s design responsibility transfer to us?”

What comes back

The clause, the exact sentence, and how it differs from the standard form.

3

Check the damages and the caps

Damages up, caps off, and carve-outs that decide what the cap is worth.

“What are the delay damages, how many milestones carry them, and what sits outside the overall cap?”

What comes back

The damages rate, the damages-bearing dates, the overall cap and the carve-outs, each with its clause.

4

Ground risk, direct and indirect

The indirect version calls the geotechnical report “for information only”, which does the same job with less visibility.

“Does this contract transfer ground risk to us, directly or indirectly?”

What comes back

Every clause that touches ground conditions, the survey date, and what the report actually covers.

5

When the money arrives

The lag is the payment period plus the certification cycle, and retention decides the rest.

“Show me the payment period, the certification cycle, the retention terms, and when our security is released.”

What comes back

The payment and certification timeline, retention and its release trigger, and whether the client’s own security was struck out.

6

Run your risk checklist

The same questions on every tender, answered from the documents.

“Run our risk checklist on this tender.”

What comes back

A yes or no per check, each with the clause behind it, comparable with earlier tenders.

What changes at go/no-go.

What changes at go/no-go.

What changes at go/no-go.

A go/no-go you can defend

Every red flag shows the clause behind it.

The same method every time

Your positions and checks applied to every contract.

Time back for judgement

The reading is done. The team’s hours go to the red flags, the clarifications and the price of the risk.

From the bid team to the contract.

Bid, commercial, legal and delivery teams work from the same view of the contract. Findings and sign-offs are shared, so the risk the bid team assessed is the risk the project team carries into delivery.

Tender & bid leads

Make the go/no-go call on what the contract actually says.

Contract, commercial & legal

Review deviations from your positions and the obligations you’d take on.

Project delivery

Inherit the obligations, time bars and positions the bid team found.

Volve helps efficiently identify contractual deviations and hidden risk elements across the full contract material, providing a complete foundation for legal risk assessment.

Ruben Øverby

Attorney-at-Law, Skanska

See what your contract actually says.

Win the right work at the right terms

Bring a real tender and we’ll run it through Volve with you. You’ll see where it deviates from your positions, the obligations and time bars you’d take on, and what the latest addendum changed, each with its clause. Your team makes the call.

A working session on your own documents

Deviations, obligations and what changed

No preparation needed from your team

Book a 30-Minute Demo

By submitting this form I agree to my details being used in sole connection with the intended enquiry. Please check our privacy policy to see how we protect and manage your submitted data.

What risk and commercial teams ask first.

What risk and commercial teams ask first.

What risk and commercial teams ask first.

No. Volve surfaces the deviations, obligations and changes, each with its clause. The decision to bid, walk or renegotiate stays with your team.