Used on more than 2,500 construction tenders and contracts
What it covers
Tender material is rarely complete. Some tenders come with a model and full drawings, others with a specification and a few sheets.
Volve uses what is present and relevant, and shows which it used.
From the documents
Items and quantities stated in the specification, conditions and bills, read with the clause or page behind them.
From the drawings
Quantities measured from the drawings where the drawings carry them.
From the BIM model
Quantities taken from model objects where a model is provided.
Status on every line
Each line is marked measured, counted, conditional or not quantified.
Gaps kept open
A line the material cannot support stays open and marked. You close it with your own input or a stated assumption.
Links to the source
One click from any line to the sheet, clause or model object it rests on.
How it works
Upload the set as issued. Where you want or need to measure, Volve builds the bill from the drawings and model. Where the client supplies it, Volve checks it.
Whatever is present
Volve reads the specification and conditions, measures what the drawings show and takes quantities from the model when there is one. Each source is used where it is the best evidence for the line.


Traceable
Each line links to the drawing, specification or model object it came from and is marked measured, counted, conditional or not quantified. Your estimator sees at a glance which lines to check first.
Maturity
Early in a tender, many lines are conditional or cannot yet be quantified. As drawings are issued and a model is added, more lines can be measured or counted, and the mix shifts.


Quantities
Measured and counted lines show their source. Conditional lines show the open point they wait on, and assumptions are marked with their basis. Gaps stay open instead of being guessed.
Compared
Most teams build the BoQ by hand, often from a subset of the material. Here is how that compares.
Last verified: November 2026

VOLVE INSIGHTS
Can AI read construction drawings and do the take-off?
AI can read drawings and produce a take-off. What decides whether you can build a bid on it: what is there, what is not, the standard to measure by, and what each estimate rests on.
See a bill from your tender.
Source on every line.
Bring the drawings, documents and model you have. We show which lines Volve measures, counts or leaves open, and why.
FAQ













